This design/build project on two floors provides 22 new classrooms, new offices and a library.
Construction is steel frame on a pile foundation system; the exterior is brick, metal panels and precast stone. The building is fully air-conditioned.
The school was part of an accelerated School Construction program and was fast tracked.